If you have a large number of jobs to add to an event, all with similar periods, you can save time by using the Copy Job command.
- From the Jobs tab of the event, select (check) the job needing to be copied.
- Select the ellipsis command
- Select the "Copy selected job..." command.
- A copy of the job will be presented, where you can change any specifics about this new job.
- Select the [Save] command on the job dialog when ready to save the copied job.
Comments
0 comments
Please sign in to leave a comment.